TC KNPP PowerPlant
Lead Scripter • Nuclear Reactor Control Systems • Full Commission
Project Overview
TC KNPP PowerPlant is an in-progress commission where I'm responsible for scripting the entire nuclear power plant simulation. This includes comprehensive reactor control systems, 3D button animations, realistic rod control mechanisms, emergency shutdown procedures, and complete operational functionality.
Development Preview V1 • More updates coming soon
My Responsibilities
- Complete scripting of all reactor control systems
- 3D button animations with realistic press/release effects
- Interactive 3D control elements and switches
- Reactor rod control mechanisms (insertion/extraction)
- Emergency shutdown systems and safety protocols
- Power generation and distribution systems
- Control room interface functionality
- Alarm and warning systems implementation
Technical Systems
This project involves building realistic nuclear power plant mechanics from the ground up, with attention to authentic operational procedures and safety systems.
Reactor Core
Complete reactor simulation with control rods, power output, and thermal dynamics
3D Controls
Animated buttons, switches, and levers with realistic physics and feedback
Rod Control
Precise rod insertion/extraction with position tracking and safety interlocks
Safety Systems
Emergency SCRAM, automatic shutdowns, and comprehensive alarm systems
Power Management
Real-time power generation, load balancing, and distribution networks
Control Room
Fully functional control room with gauges, displays, and operator interfaces